Premier Tissues

Client :

Premier Tissues

Problem :

A series of starters to start and operate the 250KW motors, wherein in normal course each motor has to have one soft starter, leading to intensive capital and operational costs.

Solution and Benefit :

BEC’s engineers along with project consultant analyzed the processes, the functions and product requirement.  A team of professionals worked on various solutions and finally arrived at an innovative, value-engineering solution; wherein, three or more motors can be started and operated by one soft starter, through a by-pass arrangement.  This solution drastically reduced the capital costs for the customer and increased the efficiency.

Real Estate

Client :

One of India’s leading property developers

Background :

One of the leading construction and property developers in India was facing unique challenges in each project with respect to required power for the building versus power sanctioned by the Electricity Board.

Problem :

One of the projects had a Restricted Load Application, wherein only 7 MegaWatt of power was sanctioned and on crossing the sanctioned load, the cost of power per unit would exponentially increase.  The challenge was to monitor the load and transfer the additional load to an alternative source, to restrict the usage within 7 Megawatt.

Solution :

The professionals from BEC along with consultants and client engineers studied the power requirements, analyzed the loading patterns, and documented the critical power usage within the building and provided a feasible solution; wherein, whenever the load reached the threshold value, the additional load is transferred to a DG set, which in turn was able to support the additional requirement of power, seamlessly.

Benefits :

The Client was extremely satisfied with the solution, as it reduced the overall costs and the risk associated with the restricted load application.  In addition, even the maximum demand for power was met seamlessly through the transfer of load to the DG set.